Homework
#6
Gate
Delay, Power, MUX
Part
(A):
For
each module in your midterm project design:
-Calculate
the average gate delay.
-Calculate
the average power dissipation.
Based
on these results, calculate:
-Calculate
the gate delay for each operation.
-Maximum
gate delay for all operations and show that your design works at 30 MHz.
-Calculate
the average power dissipation over all operations assuming that the likelihood
of each operation is equal.
Part
(B):
Design,
test and layout an 8 to 1 MUX employing pass-transistor logic and the technology
files employed in your midterm project.Make
sure that you test the circuit when the control input switches at 30 MHz.
|